Gigawatt IndustriesGigawatt Industries
  • About
    • Who We Are
    • How We Got Here
    • Careers
  • What We Do
    • DC Fast Charging
    • AC Charging
    • Grid Connections
    • Civil Engineering
    • Fleet
    • Design
    • Renewables
  • Projects
    • All projects
    • Ongoing projects
  • Insights
  • Clients
  • Get in touch
  • About
    • Who We Are
    • How We Got Here
    • Careers
  • What We Do
    • DC Fast Charging
    • AC Charging
    • Grid Connections
    • Civil Engineering
    • Fleet
    • Design
    • Renewables
  • Projects
    • All projects
    • Ongoing projects
  • Insights
  • Clients
  • Get in touch
Gigawatt IndustriesGigawatt Industries

Full-scope EV charging infrastructure for public authorities, workplaces, fleets and commercial operators across the UK.

Popular links

  • What We Do
  • Projects
  • Insights
  • Who We Are
  • Careers

Contact

  • Unit 7 Blyth Rd, Harworth, Doncaster DN11 8RW
  • 0114 706 9953
  • [email protected]
Get in touch

Client Portal

Track your project's progress and access documents any time.

Client Portal

© 2026 Gigawatt Industries Ltd. All rights reserved.

  • Privacy policy
  • Terms of service
  • Accreditations
All projects

Case study

Vale Green Energy, Rotherdale Farm.

Two 400kW ultra-rapid chargers, energised off a private on-site 66kV network.

Client
Vale Green Energy
Location
Pershore
Scope
Turnkey installation, LV & commissioning

What’s on site

Project overview.

Off-grid, on-site power.

Gigawatt Industries delivered two 400kW Zerova DQ480 ultra-rapid chargers at Rotherdale Farm for Vale Green Energy, drawing power from the site’s own private 66kV network, fed by its existing 20MW solar and anaerobic digestion plant, so no DNO connection was required.

Turnkey install and commissioning.

Our scope covered installing the client-supplied feeder pillar and both chargers, cable gantry and LV cabling, earthing and bonding, ARMCO impact protection, bay marking, and testing, certification and commissioning through to energisation.

Key facts

  • 2× Zerova DQ480 ultra-rapid DC chargers (each run at 400kW).

  • Powered by the client’s private 66kV network, no DNO connection or metering required.

  • Feeder pillar installation, LV cabling, earthing/bonding and ARMCO impact protection.

  • Full inspection, testing and BS 7671 certification, coordinated with Zerova commissioning.

  • Delivered for Vale Green Energy.

Gallery

Services used on this project

  • Grid Connections
  • Civil Engineering
  • DC Fast Charging
  • Design & Engineering

Related projects

All projects
The Centre Livingston case study
Scotland

The Centre Livingston

Gloucester Services Northbound case study
Gloucester, M5 Northbound

Gloucester Services Northbound

Gloucester Services Southbound case study
Gloucester, M5 Southbound

Gloucester Services Southbound

Cardigan Fields Leeds case study
Leeds

Cardigan Fields Leeds

Hinchingbrooke Business Park case study
Huntingdon

Hinchingbrooke Business Park

Mid Kent Shopping Centre case study
Maidstone

Mid Kent Shopping Centre

Let's discuss your project

Talk to us about site surveys, grid capacity, and delivery timelines.

Get in touch today