Gigawatt IndustriesGigawatt Industries
  • About
    • Who We Are
    • How We Got Here
    • Careers
  • What We Do
    • DC Fast Charging
    • AC Charging
    • Grid Connections
    • Civil Engineering
    • Fleet
    • Design
    • Renewables
  • Projects
    • All projects
    • Ongoing projects
  • Insights
  • Clients
  • Get in touch
  • About
    • Who We Are
    • How We Got Here
    • Careers
  • What We Do
    • DC Fast Charging
    • AC Charging
    • Grid Connections
    • Civil Engineering
    • Fleet
    • Design
    • Renewables
  • Projects
    • All projects
    • Ongoing projects
  • Insights
  • Clients
  • Get in touch
Gigawatt IndustriesGigawatt Industries

Full-scope EV charging infrastructure for public authorities, workplaces, fleets and commercial operators across the UK.

Popular links

  • What We Do
  • Projects
  • Insights
  • Who We Are
  • Careers

Contact

  • Unit 7 Blyth Rd, Harworth, Doncaster DN11 8RW
  • 0114 706 9953
  • [email protected]
Get in touch

Client Portal

Track your project's progress and access documents any time.

Client Portal

© 2026 Gigawatt Industries Ltd. All rights reserved.

  • Privacy policy
  • Terms of service
  • Accreditations
All projects

Case study

Electric HGV Charging, Rotherdale Farm.

Two 400kW ultra-rapid chargers for electric HGVs, energised off a private on-site 66kV network at a working farm and energy site.

Client
Vale Green Energy
Location
Pershore
Scope
Turnkey eHGV charging installation, LV & commissioning

What’s on site

Project overview.

Built for electric HGVs.

This is heavy goods charging. Both units sit on the yard’s concrete hardstanding along the loading elevation, with HGV-length bays marked out in front of them and enough open apron for an artic to swing in, charge, and pull away without shunting.

At 400kW per unit the power is sized for tractor units and rigids rather than vans, and each cabinet carries twin CCS2 outlets.

Off-grid, on-site power.

Charging at this power level usually means a long wait for a DNO connection. Not here. Gigawatt Industries energised both 400kW Zerova DQ480 units off the site’s own private 66kV network, fed by its existing 20MW solar and anaerobic digestion plant, so no DNO connection or metering was required.

Ultra-rapid HGV charging, running on power generated on the same site it serves.

Turnkey install and commissioning.

Our scope covered installing the client-supplied feeder pillar and both chargers, cable gantry and LV cabling, earthing and bonding, ARMCO barriers and wheel stops to take the knocks that come with HGV manoeuvring, bay marking, and testing, certification and commissioning through to energisation.

Key facts

  • An electric HGV charging site, bays and apron laid out for tractor units and rigids.

  • 2× Zerova DQ480 ultra-rapid DC chargers (each run at 400kW), twin CCS2 outlets per unit.

  • Powered by the client’s private 66kV network, no DNO connection or metering required.

  • Generation on site: 20MW of solar and anaerobic digestion feeding the charging.

  • Feeder pillar installation, LV cabling, earthing/bonding, ARMCO impact protection and wheel stops.

  • Full inspection, testing and BS 7671 certification, coordinated with Zerova commissioning.

  • Delivered for Vale Green Energy.

Gallery

Services used on this project

  • Grid Connections
  • Civil Engineering
  • DC Fast Charging
  • Fleet Charging

Related projects

All projects
The Centre Livingston case study
Scotland

The Centre Livingston

Gloucester Services Northbound case study
Gloucester, M5 Northbound

Gloucester Services Northbound

Gloucester Services Southbound case study
Gloucester, M5 Southbound

Gloucester Services Southbound

Cardigan Fields Leeds case study
Leeds

Cardigan Fields Leeds

Black Bull Pub, Greene King case study
Newcastle upon Tyne

Black Bull Pub, Greene King

Hinchingbrooke Business Park case study
Huntingdon

Hinchingbrooke Business Park

Let's discuss your project

Talk to us about site surveys, grid capacity, and delivery timelines.