Gigawatt IndustriesGigawatt Industries
  • About
    • Who We Are
    • How We Got Here
    • Careers
  • What We Do
    • DC Fast Charging
    • AC Charging
    • Grid Connections
    • Civil Engineering
    • Fleet
    • Design
    • Renewables
  • Projects
    • All projects
    • Ongoing projects
  • Insights
  • Clients
  • Get in touch
  • About
    • Who We Are
    • How We Got Here
    • Careers
  • What We Do
    • DC Fast Charging
    • AC Charging
    • Grid Connections
    • Civil Engineering
    • Fleet
    • Design
    • Renewables
  • Projects
    • All projects
    • Ongoing projects
  • Insights
  • Clients
  • Get in touch
Gigawatt IndustriesGigawatt Industries

Full-scope EV charging infrastructure for public authorities, workplaces, fleets and commercial operators across the UK.

Popular links

  • What We Do
  • Projects
  • Insights
  • Who We Are
  • Careers

Contact

  • Unit 7 Blyth Rd, Harworth, Doncaster DN11 8RW
  • 0114 706 9953
  • contact@gigawatt.co.uk
Get in touch

Client Portal

Track your project's progress and access documents any time.

Client Portal

© 2026 Gigawatt Industries Ltd. All rights reserved.

  • Privacy policy
  • Terms of service
  • Accreditations
All projects

Case study

Mid Kent Shopping Centre.

Transforming a shopping-centre car park into an ultra-rapid charging hub.

Client
PoGo Charge
Location
Maidstone
Scope
Principal contractor, civils & electrical

What’s on site

Project overview.

A shopping-centre car park, transformed.

Gigawatt Industries partnered with PoGo Charge to transform the car park at Mid Kent Shopping Centre into a state-of-the-art electric vehicle (EV) charging hub. As the principal contractor, we delivered a turnkey solution that drew on both our civil and electrical engineering expertise.

What we delivered.

The project installed eight ultra-rapid PoGo Touch charging points supported by a Schneider Electric feeder pillar and a robust cabling and ducting network, all designed to ensure operational efficiency and reliability.

Key facts

  • 4× 200kW PoGo Touch charging points, ultra-rapid EV chargers with user-friendly interfaces.

  • 4× dedicated power units, each charger supported by its own power unit for optimal performance.

  • 1× 1600A Schneider feeder pillar, advanced metering, surge protection and earth-leakage safety.

  • NAL STAKKAbox foundations and retention sockets, durable, modular cable management and secure installations.

  • 10× bollard protection barriers and a 7m split barrier, protecting chargers and improving site flow.

Gallery

Services used on this project

  • Grid Connections
  • Civil Engineering
  • DC Fast Charging

Related projects

All projects
The Centre Livingston case study
Scotland

The Centre Livingston

Gloucester Services Northbound case study
Gloucester, M5 Northbound

Gloucester Services Northbound

Gloucester Services Southbound case study
Gloucester, M5 Southbound

Gloucester Services Southbound

Cardigan Fields Leeds case study
Leeds

Cardigan Fields Leeds

Black Bull Pub, Greene King case study
Newcastle upon Tyne

Black Bull Pub, Greene King

Hinchingbrooke Business Park case study
Huntingdon

Hinchingbrooke Business Park

Let's discuss your project

Talk to us about site surveys, grid capacity, and delivery timelines.

Get in touch today