Gigawatt IndustriesGigawatt Industries
  • About
    • Who We Are
    • How We Got Here
    • Careers
  • What We Do
    • DC Fast Charging
    • AC Charging
    • Grid Connections
    • Civil Engineering
    • Fleet
    • Design
    • Renewables
  • Projects
    • All projects
    • Ongoing projects
  • Insights
  • Clients
  • Get in touch
  • About
    • Who We Are
    • How We Got Here
    • Careers
  • What We Do
    • DC Fast Charging
    • AC Charging
    • Grid Connections
    • Civil Engineering
    • Fleet
    • Design
    • Renewables
  • Projects
    • All projects
    • Ongoing projects
  • Insights
  • Clients
  • Get in touch
Gigawatt IndustriesGigawatt Industries

Full-scope EV charging infrastructure for public authorities, workplaces, fleets and commercial operators across the UK.

Popular links

  • What We Do
  • Projects
  • Insights
  • Who We Are
  • Careers

Contact

  • Unit 7 Blyth Rd, Harworth, Doncaster DN11 8RW
  • 0114 706 9953
  • contact@gigawatt.co.uk
Get in touch

Client Portal

Track your project's progress and access documents any time.

Client Portal

© 2026 Gigawatt Industries Ltd. All rights reserved.

  • Privacy policy
  • Terms of service
  • Accreditations
What we do

Grid Connection.

Accredited ICP grid connections across the UK: new and upgraded power infrastructure, delivered turnkey from feasibility to energisation.

What is an ICP, and what do we do?

An Independent Connection Provider (ICP) is an accredited company authorised to design, build, and connect new electricity networks to the grid. At Gigawatt, we're fully certified to deliver ICP services that streamline the entire connection process, from initial design through to final energisation. By working directly with Distribution Network Operators (DNOs), we manage the complex technical and regulatory requirements on your behalf.

Why choose an accredited ICP?

1

Faster timelines

Get connected quicker through accredited ICP processes.

2

Cost efficiency

Lower overall project costs via competitive procurement.

3

Full compliance

DNO-approved and fully regulated at every step.

Where we’ve delivered this

All projects →
Kilmarnock Bus Station, Grid Connection project by Gigawatt

Fleet Infrastructure · Kilmarnock

Kilmarnock Bus Station

Read case study
Hull Quays, Grid Connection project by Gigawatt

Rapid Charging Hub · Hull

Hull Quays

Read case study
Cardigan Fields Leeds, Grid Connection project by Gigawatt

Rapid Charging Hub · Leeds

Cardigan Fields Leeds

Read case study

Our ICP services

Every stage handled in-house by one accountable team.

  1. 01

    Feasibility studies

    Surveys and on-site assessments.

  2. 02

    Design & approvals

    CAD drawings and DNO/IDNO coordination.

  3. 03

    Construction & installation

    Ducting, cabling, and network builds.

  4. 04

    Testing & energisation

    Engineers commissioning live connections.

Our substation solutions

At Gigawatt, we don't just install chargers; we build the electrical backbone that makes them work. Our in-house civil engineers, EV specialists, ICP engineers, and project managers collaborate from the outset to ensure every substation is seamlessly designed, fitted, and built to last.

  • Step-down substations

    Transform high-voltage grid input into safe, usable power for hubs and depots.

  • Modular / compact substations

    Factory-built units that save space and speed up installation.

  • Indoor / outdoor / underground

    Flexible enclosures to match site conditions and planning requirements.

  • Industrial high-capacity substations

    Designed for high-demand operations such as fleet depots and multi-bay hubs.

Free download

Get the Grid Connection pack.

Specs, site requirements, real project examples and budget guidance: everything you need to put Grid Connection in front of your board, in one PDF.

We’ll email you the pack you asked for. We only use your details to respond to your request.

Gigawatt Industries

Grid Connection pack

PDF · free download

Emma Chetwynd Jarvis, Development Director

Get in touch

Interested in Grid Connection?

Speak to Emma about your site, timelines, and how we can help, no call centre, no forms.

Emma Chetwynd Jarvis · Development Director

emma@gigawatt.co.uk 0114 706 9953