Gigawatt IndustriesGigawatt Industries
  • About
    • Who We Are
    • How We Got Here
    • Careers
  • What We Do
    • DC Fast Charging
    • AC Charging
    • Grid Connections
    • Civil Engineering
    • Fleet
    • Design
    • Renewables
  • Projects
    • All projects
    • Ongoing projects
  • Insights
  • Clients
  • Get in touch
  • About
    • Who We Are
    • How We Got Here
    • Careers
  • What We Do
    • DC Fast Charging
    • AC Charging
    • Grid Connections
    • Civil Engineering
    • Fleet
    • Design
    • Renewables
  • Projects
    • All projects
    • Ongoing projects
  • Insights
  • Clients
  • Get in touch
Gigawatt IndustriesGigawatt Industries

Full-scope EV charging infrastructure for public authorities, workplaces, fleets and commercial operators across the UK.

Popular links

  • What We Do
  • Projects
  • Insights
  • Who We Are
  • Careers

Contact

  • Unit 7 Blyth Rd, Harworth, Doncaster DN11 8RW
  • 0114 706 9953
  • contact@gigawatt.co.uk
Get in touch

Client Portal

Track your project's progress and access documents any time.

Client Portal

© 2026 Gigawatt Industries Ltd. All rights reserved.

  • Privacy policy
  • Terms of service
  • Accreditations
All projects

Case study

Cardigan Fields Leeds.

A high-power HV charging hub at a Leeds leisure destination.

Client
RAW Charging
Location
Leeds
Scope
HV connection, civils & electrical

What’s on site

Project overview.

A high-power hub at a Leeds leisure destination.

Gigawatt Industries delivered a high-power EV charging hub at Cardigan Fields, a busy leisure and retail destination on Kirkstall Road in Leeds, for RAW Charging. The scheme was built around a new HV point of connection, with the civils and electrical infrastructure to support a large bank of DC and AC chargers across the car park.

Fourteen charge points, three ratings.

In total the site provides fourteen charge points, six 150kW HYC150 ultra-rapid units, three 50kW HYC50 rapid units and five 22kW CP6K AC units, giving visitors the flexibility to top up quickly or charge while they shop, eat and unwind. The project was delivered end to end and taken through to energisation, with EV bay marking and signage completing the works.

Key facts

  • 14 charge points: 6× HYC150 (150kW), 3× HYC50 (50kW) and 5× CP6K (22kW AC).

  • New HV point of connection with packaged substation infrastructure.

  • Full civils and electrical delivery across a live leisure destination.

  • EV bay marking and signage across the car park.

  • Delivered for RAW Charging.

Gallery

Services used on this project

  • Grid Connections
  • Civil Engineering
  • DC Fast Charging
  • AC Charging

Related projects

All projects
The Centre Livingston case study
Scotland

The Centre Livingston

Gloucester Services Northbound case study
Gloucester, M5 Northbound

Gloucester Services Northbound

Gloucester Services Southbound case study
Gloucester, M5 Southbound

Gloucester Services Southbound

Black Bull Pub, Greene King case study
Newcastle upon Tyne

Black Bull Pub, Greene King

Hinchingbrooke Business Park case study
Huntingdon

Hinchingbrooke Business Park

Mid Kent Shopping Centre case study
Maidstone

Mid Kent Shopping Centre

Let's discuss your project

Talk to us about site surveys, grid capacity, and delivery timelines.