Gigawatt IndustriesGigawatt Industries
  • About
    • Who We Are
    • How We Got Here
    • Careers
  • What We Do
    • DC Fast Charging
    • AC Charging
    • Grid Connections
    • Civil Engineering
    • Fleet
    • Design
    • Renewables
  • Projects
    • All projects
    • Ongoing projects
  • Insights
  • Clients
  • Get in touch
  • About
    • Who We Are
    • How We Got Here
    • Careers
  • What We Do
    • DC Fast Charging
    • AC Charging
    • Grid Connections
    • Civil Engineering
    • Fleet
    • Design
    • Renewables
  • Projects
    • All projects
    • Ongoing projects
  • Insights
  • Clients
  • Get in touch
Gigawatt IndustriesGigawatt Industries

Full-scope EV charging infrastructure for public authorities, workplaces, fleets and commercial operators across the UK.

Popular links

  • What We Do
  • Projects
  • Insights
  • Who We Are
  • Careers

Contact

  • Unit 7 Blyth Rd, Harworth, Doncaster DN11 8RW
  • 0114 706 9953
  • contact@gigawatt.co.uk
Get in touch

Client Portal

Track your project's progress and access documents any time.

Client Portal

© 2026 Gigawatt Industries Ltd. All rights reserved.

  • Privacy policy
  • Terms of service
  • Accreditations
All projects

Case study

Gloucester ServicesSouthbound.

An ultra-rapid charging hub for the M5 southbound carriageway at Gloucester Services.

Client
Evolt
Location
Gloucester, M5 Southbound
Scope
Turnkey civils & electrical

What’s on site

Project overview.

A southbound hub in its own right.

On the southbound side of Westmorland's Gloucester Services, Gigawatt delivered a second full turnkey ultra-rapid hub for Evolt, a complete installation in its own right, mirroring the scale of its northbound counterpart across the motorway.

What we delivered.

Seven 150kW charge points, power units, an LV feeder pillar and all supporting civils and cabling were installed on the southbound carriageway, carefully sequenced around the live services to keep the site trading throughout.

One of a pair, its sister hub sits across the carriageway on the northbound side.

One corridor, both directions.

Delivered alongside the northbound hub, the two installations together provide 5.6MW and 14 ultra-rapid charge points across both carriageways of the M5 between junctions 11A and 12, complete coverage for traffic heading in either direction.

Key facts

  • 7× 150kW ultra-rapid charge points serving the southbound carriageway.

  • Full turnkey civils & electrical: 14 power units, LV feeder pillar, cabling and groundworks.

  • Sequenced around a live, high-footfall motorway services operation.

  • Built in parallel with the sister northbound hub across the M5.

  • Delivered for Evolt.

Gallery

Services used on this project

  • Grid Connections
  • Civil Engineering
  • DC Fast Charging
  • Design & Engineering

Related projects

All projects
The Centre Livingston case study
Scotland

The Centre Livingston

Gloucester Services Northbound case study
Gloucester, M5 Northbound

Gloucester Services Northbound

Cardigan Fields Leeds case study
Leeds

Cardigan Fields Leeds

Black Bull Pub, Greene King case study
Newcastle upon Tyne

Black Bull Pub, Greene King

Hinchingbrooke Business Park case study
Huntingdon

Hinchingbrooke Business Park

Mid Kent Shopping Centre case study
Maidstone

Mid Kent Shopping Centre

Let's discuss your project

Talk to us about site surveys, grid capacity, and delivery timelines.

Get in touch today