Case study
Delivering one of Scotland's largest EV charging hubs.
Gigawatt Industries was appointed by PoGo to deliver a major EV charging hub in Livingston, part of PoGo's push to create convenient, reliable charging destinations and accelerate the shift to electric across the UK.
We delivered the full civil and electrical infrastructure: excavation and groundworks, ducting and cable routes, charger foundations, electrical connections, and the installation and commissioning of the charging equipment, coordinated across multiple stakeholders to keep the programme safe and on track.
Delivered in a live retail environment, phased to keep the centre trading throughout.
From site preparation through to energisation and testing, every stage was planned to deliver a robust, future-ready hub. The result gives drivers ultra-rapid charging in a strategically important location, for both local trips and longer journeys, and adds meaningful capacity to the UK network.
Schneider Electric 3400A feeder pillar
Turnkey project delivery
iCharging Touch+ 200kW DC chargers
Formed drainage channels and repositioned car park barriers
Services used on this project
Talk to us about site surveys, grid capacity, and delivery timelines.