Case study
OngoingA turnkey + ICP ultra-rapid hub under construction at a leisure destination in Aberdeen.
Gigawatt Industries is delivering a combined HV and LV connection at Queens Link, Aberdeen, for RAW Charging: four 150kW and three 50kW ultra-rapid DC chargers alongside five 22kW AC units.
Groundworks and cable installation are underway, with the first AC bays already live while the ultra-rapid DC infrastructure is completed and commissioned.
4× 150kW + 3× 50kW ultra-rapid DC chargers, plus 5× 22kW AC units.
Combined HV and LV connection delivered turnkey + ICP.
Phased build: AC bays live on site while DC infrastructure completes.
Delivered for RAW Charging.