Gigawatt IndustriesGigawatt Industries
  • About
    • Who We Are
    • How We Got Here
    • Careers
  • What We Do
    • DC Fast Charging
    • AC Charging
    • Grid Connections
    • Civil Engineering
    • Fleet
    • Design
    • Renewables
  • Projects
    • All projects
    • Ongoing projects
  • Insights
  • Clients
  • Get in touch
  • About
    • Who We Are
    • How We Got Here
    • Careers
  • What We Do
    • DC Fast Charging
    • AC Charging
    • Grid Connections
    • Civil Engineering
    • Fleet
    • Design
    • Renewables
  • Projects
    • All projects
    • Ongoing projects
  • Insights
  • Clients
  • Get in touch
Gigawatt IndustriesGigawatt Industries

Full-scope EV charging infrastructure for public authorities, workplaces, fleets and commercial operators across the UK.

Popular links

  • What We Do
  • Projects
  • Insights
  • Who We Are
  • Careers

Contact

  • Unit 7 Blyth Rd, Harworth, Doncaster DN11 8RW
  • 0114 706 9953
  • contact@gigawatt.co.uk
Get in touch

Client Portal

Track your project's progress and access documents any time.

Client Portal

© 2026 Gigawatt Industries Ltd. All rights reserved.

  • Privacy policy
  • Terms of service
  • Accreditations
All projects

Case study

Xscape Yorkshire.

A high-power HV charging hub at one of Yorkshire’s biggest leisure destinations.

Client
RAW Charging
Location
Castleford
Scope
HV connection, civils & electrical

What’s on site

Project overview.

A destination-scale HV scheme.

Gigawatt Industries delivered high-power EV charging at Xscape Yorkshire in Castleford for RAW Charging, a major leisure destination drawing large volumes of visitors, and a charging load to match.

What we delivered.

The scheme was built around a new HV point of connection, with the civils and electrical infrastructure to support two HYC50 and six HYC150 DC chargers plus six 22kW AC units. The site was later upgraded with 300kW chargers as demand grew.

One of two flagship Xscape hubs Gigawatt delivered for RAW Charging, its sister site is at Xscape Milton Keynes.

Built for a busy public setting.

Delivering an HV connection and a large simultaneous charging load in a live, high-footfall destination demanded careful sequencing of the civils, substation and electrical works to keep the site open throughout.

Key facts

  • 2× HYC50, 6× HYC150 DC and 6× 22kW AC chargers, later upgraded with 300kW units.

  • New HV point of connection with packaged substation infrastructure.

  • Large-scale civils and electrical delivery in a live leisure destination.

  • Sister hub to Xscape Milton Keynes, also delivered by Gigawatt.

  • Delivered for RAW Charging.

Gallery

Services used on this project

  • Grid Connections
  • Civil Engineering
  • DC Fast Charging
  • AC Charging

Related projects

All projects
The Centre Livingston case study
Scotland

The Centre Livingston

Gloucester Services Northbound case study
Gloucester, M5 Northbound

Gloucester Services Northbound

Gloucester Services Southbound case study
Gloucester, M5 Southbound

Gloucester Services Southbound

Cardigan Fields Leeds case study
Leeds

Cardigan Fields Leeds

Black Bull Pub, Greene King case study
Newcastle upon Tyne

Black Bull Pub, Greene King

Hinchingbrooke Business Park case study
Huntingdon

Hinchingbrooke Business Park

Let's discuss your project

Talk to us about site surveys, grid capacity, and delivery timelines.

Get in touch today