Gigawatt IndustriesGigawatt Industries
  • About
    • Who We Are
    • How We Got Here
    • Careers
  • What We Do
    • DC Fast Charging
    • AC Charging
    • Grid Connections
    • Civil Engineering
    • Fleet
    • Design
    • Renewables
  • Projects
    • All projects
    • Ongoing projects
  • Insights
  • Clients
  • Get in touch
  • About
    • Who We Are
    • How We Got Here
    • Careers
  • What We Do
    • DC Fast Charging
    • AC Charging
    • Grid Connections
    • Civil Engineering
    • Fleet
    • Design
    • Renewables
  • Projects
    • All projects
    • Ongoing projects
  • Insights
  • Clients
  • Get in touch
Gigawatt IndustriesGigawatt Industries

Full-scope EV charging infrastructure for public authorities, workplaces, fleets and commercial operators across the UK.

Popular links

  • What We Do
  • Projects
  • Insights
  • Who We Are
  • Careers

Contact

  • Unit 7 Blyth Rd, Harworth, Doncaster DN11 8RW
  • 0114 706 9953
  • contact@gigawatt.co.uk
Get in touch

Client Portal

Track your project's progress and access documents any time.

Client Portal

© 2026 Gigawatt Industries Ltd. All rights reserved.

  • Privacy policy
  • Terms of service
  • Accreditations
All projects

Case study

Xscape Milton Keynes.

A large HV charging hub at Xscape’s flagship Milton Keynes leisure destination.

Client
RAW Charging
Location
Milton Keynes
Scope
HV connection, civils & electrical

What’s on site

Project overview.

A large hub in its own right.

At Xscape Milton Keynes, Gigawatt Industries delivered a second flagship leisure-destination charging hub for RAW Charging, a full HV scheme sized for one of the region’s busiest entertainment complexes.

What we delivered.

The installation provided four HYC50 and four HYC150 DC chargers alongside eight CP6000 AC units, supported by HV point-of-connection works, substantial civils and full electrical installation.

One of two flagship Xscape hubs Gigawatt delivered for RAW Charging, its sister site is at Xscape Yorkshire, Castleford.

Built for a busy public setting.

As at its Yorkshire counterpart, delivering a high simultaneous charging load in a live, high-footfall destination meant carefully coordinating the connection, groundworks and electrical package around ongoing public operations.

Key facts

  • 4× HYC50, 4× HYC150 DC and 8× CP6000 AC units.

  • New HV point of connection with packaged substation infrastructure.

  • Large-scale civils and electrical delivery in a live leisure destination.

  • Sister hub to Xscape Yorkshire, also delivered by Gigawatt.

  • Delivered for RAW Charging.

Gallery

Services used on this project

  • Grid Connections
  • Civil Engineering
  • DC Fast Charging
  • AC Charging

Related projects

All projects
The Centre Livingston case study
Scotland

The Centre Livingston

Gloucester Services Northbound case study
Gloucester, M5 Northbound

Gloucester Services Northbound

Gloucester Services Southbound case study
Gloucester, M5 Southbound

Gloucester Services Southbound

Cardigan Fields Leeds case study
Leeds

Cardigan Fields Leeds

Black Bull Pub, Greene King case study
Newcastle upon Tyne

Black Bull Pub, Greene King

Hinchingbrooke Business Park case study
Huntingdon

Hinchingbrooke Business Park

Let's discuss your project

Talk to us about site surveys, grid capacity, and delivery timelines.

Get in touch today