Gigawatt IndustriesGigawatt Industries
  • About
    • Who We Are
    • How We Got Here
    • Careers
  • What We Do
    • DC Fast Charging
    • AC Charging
    • Grid Connections
    • Civil Engineering
    • Fleet
    • Design
    • Renewables
  • Projects
    • All projects
    • Ongoing projects
  • Insights
  • Clients
  • Get in touch
  • About
    • Who We Are
    • How We Got Here
    • Careers
  • What We Do
    • DC Fast Charging
    • AC Charging
    • Grid Connections
    • Civil Engineering
    • Fleet
    • Design
    • Renewables
  • Projects
    • All projects
    • Ongoing projects
  • Insights
  • Clients
  • Get in touch
Gigawatt IndustriesGigawatt Industries

Full-scope EV charging infrastructure for public authorities, workplaces, fleets and commercial operators across the UK.

Popular links

  • What We Do
  • Projects
  • Insights
  • Who We Are
  • Careers

Contact

  • Unit 7 Blyth Rd, Harworth, Doncaster DN11 8RW
  • 0114 706 9953
  • contact@gigawatt.co.uk
Get in touch

Client Portal

Track your project's progress and access documents any time.

Client Portal

© 2026 Gigawatt Industries Ltd. All rights reserved.

  • Privacy policy
  • Terms of service
  • Accreditations
All projects

Case study

Tesco Workplace Charging.

Rolling out workplace charging across Tesco distribution centres.

Client
Pod Point
Location
Nationwide
Scope
Multi-site swap-out & installation

What’s on site

Project overview.

A nationwide swap-out programme.

Gigawatt Industries delivered workplace EV charging across Tesco's distribution centres and stores for Pod Point. At the distribution centres, including Doncaster, Daventry and Dagenham, the programme swapped out legacy EV chargers and installed banks of Solo 22kW units on new and existing feeder/switch matrices, with isolators added for safe maintenance.

From DCs to stores.

At the Woolwich store, five Twin 7kW units were installed on an 80A array. Each site was delivered to Pod Point's specification with full testing, commissioning and handover.

Key facts

  • Swap-out and installation of Solo 22kW charging units across Tesco distribution centres.

  • Sites including Doncaster, Daventry (Grocery & Clothing) and Dagenham DCs.

  • Woolwich store: 5× Twin 7kW units on an 80A managed array.

  • Isolators and feeder/switch matrix upgrades for safe operation and maintenance.

  • Delivered for Pod Point.

Gallery

Services used on this project

  • Grid Connections
  • Civil Engineering
  • DC Fast Charging
  • AC Charging

Related projects

All projects
The Centre Livingston case study
Scotland

The Centre Livingston

Gloucester Services Northbound case study
Gloucester, M5 Northbound

Gloucester Services Northbound

Gloucester Services Southbound case study
Gloucester, M5 Southbound

Gloucester Services Southbound

Cardigan Fields Leeds case study
Leeds

Cardigan Fields Leeds

Black Bull Pub, Greene King case study
Newcastle upon Tyne

Black Bull Pub, Greene King

Hinchingbrooke Business Park case study
Huntingdon

Hinchingbrooke Business Park

Let's discuss your project

Talk to us about site surveys, grid capacity, and delivery timelines.

Get in touch today