Substation civils and groundworks for a solar farm near Milton Keynes.
Gigawatt Industries delivered the substation civils and groundworks package for the Littlewood Solar Farm at Tathall End near Milton Keynes, working for ICP Utilligence on a new ground-mounted solar generation scheme.
Drawing on our in-house groundworks capability, the team excavated the substation compound and built and installed the reinforced substation bases ready to receive the packaged transformer and switchgear.
With the bases cured, the packaged substation was craned into position and set down. Our teams supported Utilligence through the cable pull, installed the earthing to the electrical design, and backfilled and reinstated the compound with Type 1 to leave a clean, finished substation among the solar rows.
Part of the clean-energy infrastructure Gigawatt delivers beyond EV charging, the groundworks that get renewable generation connected.
Substation compound excavated, with reinforced bases built and installed.
Packaged substation craned into position and set down.
Cable-pull support provided to ICP Utilligence.
Earthing installed to the electrical design.
Backfill and reinstatement with Type 1 to a finished compound.
Services used on this project
Talk to us about site surveys, grid capacity, and delivery timelines.