Gigawatt IndustriesGigawatt Industries
  • About
    • Who We Are
    • How We Got Here
    • Careers
  • What We Do
    • DC Fast Charging
    • AC Charging
    • Grid Connections
    • Civil Engineering
    • Fleet
    • Design
    • Renewables
  • Projects
    • All projects
    • Ongoing projects
  • Insights
  • Clients
  • Get in touch
  • About
    • Who We Are
    • How We Got Here
    • Careers
  • What We Do
    • DC Fast Charging
    • AC Charging
    • Grid Connections
    • Civil Engineering
    • Fleet
    • Design
    • Renewables
  • Projects
    • All projects
    • Ongoing projects
  • Insights
  • Clients
  • Get in touch
Gigawatt IndustriesGigawatt Industries

Full-scope EV charging infrastructure for public authorities, workplaces, fleets and commercial operators across the UK.

Popular links

  • What We Do
  • Projects
  • Insights
  • Who We Are
  • Careers

Contact

  • Unit 7 Blyth Rd, Harworth, Doncaster DN11 8RW
  • 0114 706 9953
  • contact@gigawatt.co.uk
Get in touch

Client Portal

Track your project's progress and access documents any time.

Client Portal

© 2026 Gigawatt Industries Ltd. All rights reserved.

  • Privacy policy
  • Terms of service
  • Accreditations
All projects

Case study

Littlewood Solar Farm.

Substation civils and groundworks for a solar farm near Milton Keynes.

Client
Utilligence
Location
Tathall End, Milton Keynes
Scope
Substation civils & groundworks

What’s on site

Project overview.

Groundworks for a solar farm.

Gigawatt Industries delivered the substation civils and groundworks package for the Littlewood Solar Farm at Tathall End near Milton Keynes, working for ICP Utilligence on a new ground-mounted solar generation scheme.

Drawing on our in-house groundworks capability, the team excavated the substation compound and built and installed the reinforced substation bases ready to receive the packaged transformer and switchgear.

Substation set-down and connection.

With the bases cured, the packaged substation was craned into position and set down. Our teams supported Utilligence through the cable pull, installed the earthing to the electrical design, and backfilled and reinstated the compound with Type 1 to leave a clean, finished substation among the solar rows.

Part of the clean-energy infrastructure Gigawatt delivers beyond EV charging, the groundworks that get renewable generation connected.

Key facts

  • Substation compound excavated, with reinforced bases built and installed.

  • Packaged substation craned into position and set down.

  • Cable-pull support provided to ICP Utilligence.

  • Earthing installed to the electrical design.

  • Backfill and reinstatement with Type 1 to a finished compound.

Gallery

Services used on this project

  • Grid Connections
  • Civil Engineering
  • Design & Engineering

Related projects

All projects
The Centre Livingston case study
Scotland

The Centre Livingston

Gloucester Services Northbound case study
Gloucester, M5 Northbound

Gloucester Services Northbound

Gloucester Services Southbound case study
Gloucester, M5 Southbound

Gloucester Services Southbound

Cardigan Fields Leeds case study
Leeds

Cardigan Fields Leeds

Black Bull Pub, Greene King case study
Newcastle upon Tyne

Black Bull Pub, Greene King

Hinchingbrooke Business Park case study
Huntingdon

Hinchingbrooke Business Park

Let's discuss your project

Talk to us about site surveys, grid capacity, and delivery timelines.