Gigawatt IndustriesGigawatt Industries
  • About
    • Who We Are
    • How We Got Here
    • Careers
  • What We Do
    • DC Fast Charging
    • AC Charging
    • Grid Connections
    • Civil Engineering
    • Fleet
    • Design
    • Renewables
  • Projects
    • All projects
    • Ongoing projects
  • Insights
  • Clients
  • Get in touch
  • About
    • Who We Are
    • How We Got Here
    • Careers
  • What We Do
    • DC Fast Charging
    • AC Charging
    • Grid Connections
    • Civil Engineering
    • Fleet
    • Design
    • Renewables
  • Projects
    • All projects
    • Ongoing projects
  • Insights
  • Clients
  • Get in touch
Gigawatt IndustriesGigawatt Industries

Full-scope EV charging infrastructure for public authorities, workplaces, fleets and commercial operators across the UK.

Popular links

  • What We Do
  • Projects
  • Insights
  • Who We Are
  • Careers

Contact

  • Unit 7 Blyth Rd, Harworth, Doncaster DN11 8RW
  • 0114 706 9953
  • contact@gigawatt.co.uk
Get in touch

Client Portal

Track your project's progress and access documents any time.

Client Portal

© 2026 Gigawatt Industries Ltd. All rights reserved.

  • Privacy policy
  • Terms of service
  • Accreditations
All projects

Case study

Holiday Inn Upgrades.

A nationwide EV charging upgrade programme across six Holiday Inn hotels.

Client
PoGo
Location
Nationwide
Scope
Multi-site upgrade programme

What’s on site

Project overview.

A nationwide upgrade programme.

Gigawatt Industries delivered a rolling EV charging upgrade programme across Holiday Inn hotels for PoGo, covering six sites nationwide, Haydock, Milton Keynes, Rotherham (Sheffield), Slough, Stoke and Shrewsbury.

What we delivered.

Across the estate we swapped out the existing DC chargers for new SWARCO Raption rapid units, one per hotel, from electrical surveys through to installation, connection and commissioning. Most sites received a 50kW Raption, stepping up to a 150kW unit at Stoke, while at Slough we carried out charger-relocation groundworks and full reinstatement. Every visit was coordinated around live, operational hotels to keep disruption to guests to a minimum.

Rolled out through 2026.

The programme ran across 2026, with each hotel handed over on a rolling basis as its upgrade completed, steadily strengthening EV charging provision across the Holiday Inn estate.

Key facts

  • Six Holiday Inn sites upgraded: Haydock, Milton Keynes, Rotherham (Sheffield), Slough, Stoke and Shrewsbury.

  • Existing DC chargers swapped for new SWARCO Raption rapid units, one per hotel.

  • Charger output from 50kW up to 150kW (150kW Raption at Stoke).

  • Charger-relocation groundworks and reinstatement at Slough.

  • Electrical surveys, installation and commissioning across the estate, delivered for PoGo.

Gallery

Services used on this project

  • Grid Connections
  • Civil Engineering
  • DC Fast Charging

Related projects

All projects
The Centre Livingston case study
Scotland

The Centre Livingston

Gloucester Services Northbound case study
Gloucester, M5 Northbound

Gloucester Services Northbound

Gloucester Services Southbound case study
Gloucester, M5 Southbound

Gloucester Services Southbound

Cardigan Fields Leeds case study
Leeds

Cardigan Fields Leeds

Black Bull Pub, Greene King case study
Newcastle upon Tyne

Black Bull Pub, Greene King

Hinchingbrooke Business Park case study
Huntingdon

Hinchingbrooke Business Park