Case study
A nationwide EV charging upgrade programme across eleven Greene King sites.
Gigawatt Industries delivered a rolling EV charging upgrade programme across Greene King's estate for RAW Charging, spanning eleven pubs, hotels and destinations nationwide. Many sites were originally equipped with three legacy AC chargers on a DNO supply.
At each site the programme decommissions two legacy units and replaces them with a single 50kW DC rapid charger alongside a retained 22kW AC unit, giving guests faster charging without new grid capacity. Each upgrade covers civils and ducting for the ICP works, DNO liaison, EV signage replacement, and full activation and commissioning.
The rollout ran across 2026 from The Castle in Goring-by-Sea to Chatterley Whitfield in Stoke and Chequers Castle in Coal Aston, a mix of historic pubs, hotels and visitor destinations, each handed over as its upgrade completed.
Eleven Greene King pubs, hotels and destinations upgraded nationwide.
Per site: 3× legacy AC chargers replaced with 1× 50kW DC rapid plus 1× 22kW AC retained.
Faster DC charging delivered on the existing DNO supply, no new grid capacity required.
Civils and ducting for the ICP works, DNO liaison, EV signage replacement and commissioning.
Sites: The Castle (Goring-by-Sea), The Cherry Tree, The Hart, Chequers Castle (Coal Aston), Oaklands Hotel, The Ascott, Chatterley Whitfield, The Royal George, Lullingstone Castle, White Horse and The Raven Hotel.
Delivered for RAW Charging.
Services used on this project
Talk to us about site surveys, grid capacity, and delivery timelines.