Gigawatt IndustriesGigawatt Industries
  • About
    • Who We Are
    • How We Got Here
    • Careers
  • What We Do
    • DC Fast Charging
    • AC Charging
    • Grid Connections
    • Civil Engineering
    • Fleet
    • Design
    • Renewables
  • Projects
    • All projects
    • Ongoing projects
  • Insights
  • Clients
  • Get in touch
  • About
    • Who We Are
    • How We Got Here
    • Careers
  • What We Do
    • DC Fast Charging
    • AC Charging
    • Grid Connections
    • Civil Engineering
    • Fleet
    • Design
    • Renewables
  • Projects
    • All projects
    • Ongoing projects
  • Insights
  • Clients
  • Get in touch
Gigawatt IndustriesGigawatt Industries

Full-scope EV charging infrastructure for public authorities, workplaces, fleets and commercial operators across the UK.

Popular links

  • What We Do
  • Projects
  • Insights
  • Who We Are
  • Careers

Contact

  • Unit 7 Blyth Rd, Harworth, Doncaster DN11 8RW
  • 0114 706 9953
  • contact@gigawatt.co.uk
Get in touch

Client Portal

Track your project's progress and access documents any time.

Client Portal

© 2026 Gigawatt Industries Ltd. All rights reserved.

  • Privacy policy
  • Terms of service
  • Accreditations
All projects

Case study

Arc Building 3.

A six-unit workplace array at Uxbridge Business Park.

Client
Pod Point
Location
Uxbridge
Scope
Civils & electrical installation

What’s on site

Project overview.

A managed workplace array.

Gigawatt Industries delivered workplace EV charging at Building 3, Arc Uxbridge Business Park, for Pod Point. The installation added six Twin 7kW chargers on a 100A managed array, fed from a new GRP feeder pillar with switch-fuse, Array load management, surge protection and open-PEN fault detection.

What we delivered.

Cabling was routed from the LV panel through new ducting to the array distribution board and out to each charger, before full testing, commissioning and handover, giving tenants scalable, load-managed charging across the car park.

Key facts

  • 6× Twin 7kW chargers on a 100A managed array.

  • New GRP feeder pillar with switch-fuse, Array load management and surge protection.

  • Open-PEN fault detection and dedicated LV feed from the site panel.

  • Ducted cable routes to an array distribution board serving all bays.

  • Delivered for Pod Point.

Gallery

Services used on this project

  • Grid Connections
  • Civil Engineering
  • DC Fast Charging
  • AC Charging

Related projects

All projects
The Centre Livingston case study
Scotland

The Centre Livingston

Gloucester Services Northbound case study
Gloucester, M5 Northbound

Gloucester Services Northbound

Gloucester Services Southbound case study
Gloucester, M5 Southbound

Gloucester Services Southbound

Cardigan Fields Leeds case study
Leeds

Cardigan Fields Leeds

Black Bull Pub, Greene King case study
Newcastle upon Tyne

Black Bull Pub, Greene King

Hinchingbrooke Business Park case study
Huntingdon

Hinchingbrooke Business Park

Let's discuss your project

Talk to us about site surveys, grid capacity, and delivery timelines.

Get in touch today