Gigawatt Industries partnered with Pod Point to deliver a sustainable EV charging solution at Sherwood Hospital, supporting the NHS’s commitment to reducing its environmental impact. By installing 12 twin 7kW chargers, capable of simultaneously charging 24 vehicles, we have enhanced the hospital’s facilities, providing a reliable and convenient charging solution for visitors and staff.
As Pod Point’s trusted installation partner, Gigawatt Industries carried out:
The Pod Point V7 Twin Chargers installed at Sherwood Hospital are designed for commercial applications, offering a perfect blend of reliability and advanced technology. Key features include:
The charging infrastructure is supported by two feeder pillars equipped with:
Gigawatt Industries also undertook detailed civil works, including:
Pre-excavation testing, trenching, and foundation preparation were carried out, ensuring a secure base for all installations.
Placement of feeder pillars, power units, and floodlights, alongside precise ducting and cable routing.
Installation and connection of chargers and testing to ensure compliance with operational standards.
Redesign of car park bays, application of clear markings, and installation of protective bollards and signage.
Copyright © 2024 Gigawatt Industries. All Rights Reserved. | Design by Purple Space Digital